Cagewash Site Visit Check List

  • Cagewash

  • MM slash DD slash YYYY
  • (List the Facility Manager, Department Chair or other responsible personnel)
  • Construction and Operation

    • dedicated central area for sanitizing cages and equipment is provided (Guide, p143)
    • cage-washing equipment meets need; maintenance records (Guide, p 143)
    • doors, windows, floors, drainage, walls, ceilings (Guide, pp 136-138)
    • convenient to animal areas/waste disposal (Guide, p 143)
    • ease of access (including door size) facilitates use (Guide, p 143)
    • sufficient space for staging and maneuvering (Guide, p 143)
    • safety precautions/PPE/clothing/equipment used for waste disposal/prewash/acidwash ((Guide, p 143)
    • personnel use respiratory protection while dumping bedding (dumping station or PPE)
    • traffic flow clean to dirty with no contamination of clean equipment by dirty equipment and appropriate air pressurization (Guide, p 143)
    • insulation and/or sound attenuation present as needed (Guide, p 143)
    • utilities are appropriate (Guide, p 143)
    • ventilation meets heat and humidity load (Guide, p 143)
    • safety features (e.g., SOPs and training, warning signs, eyewash stations/flush log) are in use (Guide, p 143)
    • functioning safety devices and training to prevent entrapment in washer/sterilizers (Guide, p 143)
    • cage wash temperatures are monitored and records are available of temperature tape log and quarterly sanitation monitoring participation (Guide, p 73)
    • appropriate clean cage storage (Guide, p 141)

  • Hand Washing or Presoaking